精品素人自拍偷拍|91精品国产av国产|杨思敏伦理片|91制片厂杨柳信息|亚洲激情综合|蜜桃影像传媒ios下载|亚洲精品视频在线看|打屁股色网站|爱豆文化传媒影片|国产欧美精品一区二区色,明星换脸 av,国产日韩成人av,亚洲成a人影院

 
 
 
文章檢索
首頁» 過刊瀏覽» 2023» Vol.8» Issue(5) 671-681???? DOI : 10.3969/j.issn.2096-1693.2023.05.063
最新目錄| | 過刊瀏覽| 高級檢索
進(jìn)口/ 出口計費模式下天然氣管網(wǎng)輸入/ 輸出能力驗證的兩階段魯棒模型
步亞冉, 左麗麗, 吳長春, 趙思睿
中國石油大學(xué)( 北京) 油氣管道輸送安全國家工程實驗室/石油工程教育部重點實驗室/城市油氣輸配技術(shù)北京市重點實驗室,,北京 102249
A two-stage robust model for verifying the input/output capacity of a gas pipeline network under entry/exit tariff mode
BU Yaran; ZUO Lili; WU Changchun; ZHAO Sirui
National Engineering Laboratory for Pipeline Safety, Beijing Key Laboratory of Urban Oil and Gas Distribution Technology, China University of Petroleum-Beijing, Beijing 102249, China

全文: ? HTML (1 KB)?
文章導(dǎo)讀??
摘要? 對于覆蓋區(qū)域較小且拓?fù)浣Y(jié)構(gòu)較復(fù)雜的天然氣管網(wǎng),可以采用進(jìn)口/出口計費模式提供輸氣服務(wù),即根據(jù)托運(yùn)商在管網(wǎng)進(jìn)口/出口預(yù)定的輸入/輸出能力收取管輸費,而不考慮其托運(yùn)天然氣的管輸路徑,。在該模式下,某節(jié)點的輸入/輸出能力被定義為該節(jié)點可被預(yù)定的最大輸入/輸出流量,。管網(wǎng)公司根據(jù)經(jīng)驗初定管網(wǎng)各進(jìn)口/ 出口的輸入/輸出能力,,若經(jīng)驗證,該管網(wǎng)中任何不超過節(jié)點輸入/輸出能力的輸入/輸出流量組合均存在可行的輸送方案,,則初定的節(jié)點輸入/輸出能力可以對托運(yùn)商公布并供其預(yù)定,。該驗證問題為不確定性驗證問題,需要在實際輸入/輸出流量為不確定性參數(shù)的前提下,,求解管網(wǎng)運(yùn)行方案,。本文建立了兩階段魯棒模型,將帶有不確定性參數(shù)的驗證問題轉(zhuǎn)化為針對“最差工況”的驗證問題,。第一階段將管網(wǎng)輸入/輸出流量作為決策變量,,輸入/輸出流量對應(yīng)的不確定集合轉(zhuǎn)化為約束條件,分別以各個中間壓氣站進(jìn)站壓力或分輸站的分輸壓力最低為目標(biāo),,得到多個“最差工況”,。在第二階段,驗證“最差工況”下各個最低進(jìn)站/分輸壓力是否滿足對應(yīng)的壓力下限約束,。相比于以往基于單個工況的輸入/輸出能力驗證方法,,該方法消除了人工選擇有限個工況的局限性,驗證結(jié)果更為可靠,。分析計算結(jié)果顯示:相比于基于路徑的計費模式,,復(fù)雜管網(wǎng)中進(jìn)口/出口模式下的輸氣費用更能反映實際成本;但該模式下管網(wǎng)物理輸氣能力可能無法得到充分利用,,造成管網(wǎng)輸氣能力的浪費,。本文探究了在我國區(qū)域性管網(wǎng)應(yīng)用進(jìn)口/ 出口模式的可行性,并為天然氣管網(wǎng)的公平開放制度完善提供了借鑒,。
服務(wù)
把本文推薦給朋友
加入我的書架
加入引用管理器
關(guān)鍵詞 : 計費模式,天然氣管網(wǎng),輸氣能力,優(yōu)化,魯棒優(yōu)化
Abstract

The transmission service of small and topology-complex natural gas pipeline networks can be provided using an Entry/Exit(E/E) tariff mode. The booking of gas transmission capacity under the E/E tariff mode does not consider the path of gas flow, and is charged according to injections and/or deliveries. The input/output capacity at an entry/exit in the E/E mode is defined as the maximum flow that can be booked by the shippers. The pipeline company initially determines the tentative input/ output capacities at entries/exits in the pipeline network based on experience. If there exists at least one feasible operational plan for any input/output flow combination that does not exceed the capacities at the entries/exits in the pipeline network, the initially determined input/output capacities can be published and booked by shippers. The validation of input/output capacities requires finding an operational plan for the pipeline network when the actual input/output flows are uncertain parameters. Thus, the validation problem is an uncertainty optimization problem. In this work, a two-stage robust optimization model was established to transform the validation problem with uncertain parameters into a deterministic problem of verifying the worst-case scenarios. There were several sub-models in the first stage. In each sub-model, the input and output flows at the entries and exits of a gas network were decision variables, with the corresponding uncertainty set transformed into constraints. And the objective function is to minimize the inlet pressure of each compressor or delivery station to generate the worst-case scenarios. In the second stage, the minimum inlet/delivery pressures of the compressor/delivery stations under the worst-case scenarios were verified whether they meet the lower pressure limit constraints. The input and output capacities are feasible if all the constraints are satisfied. Compared to previous capacity validation methods that based on verifying multiple scenarios, the model proposed in this study eliminated the limitation of manually selecting scenarios, ensuring that the calculation results were reliable. The results indicated that in a complex pipeline network, the gas transmission cost under the E/E mode better reflects actual costs, comparing to that under the path-based tariff mode. However, the physical gas transmission capacity of a network cannot be fully utilized under this mode in most cases, resulting in capacity wastage. Based on the input/output capacities validation model, this paper explored the feasibility of applying the E/E tariff mode in regional gas pipeline networks in China, and it could also be referred for improving the open access regime for pipeline networks.


Key words: tariff regime; gas network; gas transmission capacity; optimization; robust optimization
收稿日期: 2023-10-31 ????
PACS: ? ?
基金資助:
通訊作者: zuolili@cup.edu.cn; wucc@cup.edu.cn
引用本文: ??
步亞冉, 左麗麗, 吳長春, 趙思睿. 進(jìn)口/出口計費模式下天然氣管網(wǎng)輸入/輸出能力驗證的兩階段魯棒模型. 石油科學(xué)通報, 2023, 05: 671-681 BU Yaran; ZUO Lili; WU Changchun; ZHAO Sirui. A two-stage robust model for verifying the input/output capacity of a gas pipeline network under entry/exit tariff mode. Petroleum Science Bulletin, 2023, 05: 671-681.
鏈接本文: ?
版權(quán)所有 2016 《石油科學(xué)通報》雜志社