精品素人自拍偷拍|91精品国产av国产|杨思敏伦理片|91制片厂杨柳信息|亚洲激情综合|蜜桃影像传媒ios下载|亚洲精品视频在线看|打屁股色网站|爱豆文化传媒影片|国产欧美精品一区二区色,明星换脸 av,国产日韩成人av,亚洲成a人影院

 
 
 
文章檢索
首頁» 過刊瀏覽» 2023» Vol.8» Issue(2) 152-165???? DOI : 10.3969/ j.issn.2096-1693.2023.02.011
最新目錄| | 過刊瀏覽| 高級檢索
基于有限元數(shù)值模擬的裸眼射孔完井產能評價
翁昊陽,,王曉鵬,張啟龍,董平華,,高斌,,劉偉,,譚強
1 中海石油(中國)有限公司天津分公司,,天津 300459 2 中國石油大學(北京)油氣資源與探測國家重點實驗室,,北京 102249
Productivity evaluation of open-hole perforation completion based on finite element numerical simulation
WENG Haoyang, WANG Xiaopeng, ZHANG Qilong, DONG Pinghua, GAO Bin, LIUWei, TAN Qiang.
1 Tianjin Branch of CNOOC(China) Ltd., Tianjin 300459, China 2 State Key Laboratory of Petroleum Resources and Prospecting, China University of Petroleum-Beijing, Beijing 102249, China

全文: ? HTML (1 KB)?
文章導讀??
摘要? 基于有限元理論建立了裸眼射孔井三維可視化模型,模型中考慮了鉆完井造成的井周污染,,通過優(yōu)化射孔參數(shù)組合,,實現(xiàn)了該完井方式下產能釋放的最大化。
服務
把本文推薦給朋友
加入我的書架
加入引用管理器
關鍵詞 : 測試產能,裸眼射孔,有限元,室內實驗,提產效果
Abstract

With the continuous advancement of oil and gas exploration and development, unconventional oil and gas resources have been paid more and more attention. The production improvement is a key part of the well-test and development process, but conventional completion forms can no longer meet the oilfield’s production requirements. Therefore, in order to improve the well test productivity of tight glutenite reservoirs in Bohai Oilfield, based on the principles of reducing formation pollution and increasing the exposure area of the wellbore, a new completion form was proposed, namely open-hole perforation. Using the finite element theory, a three-dimensional model of productivity evaluation was established, and the production of different completion forms, such as open-hole perforation, open-hole and casing perforation, under specific working conditions were classified and evaluated. Afterwards, the sensitivity analysis of the parameters affecting the productivity of open-hole perforation completion was carried out. Finally, a two-dimensional planar model for perforated well was used to reveal the production improvement mechanism, and the indoor experimental results for productivity evaluation verified the laws obtained by numerical simulation. Studies have shown that the open-hole perforation completion can effectively increase the well test productivity, and the productivity improvement effect depends on the formation conditions and perforating parameter combination. Compared with the openhole completion, the rate of productivity improvement is about 40%~80%. Compared with the casing perforation completion, the rate of productivity improvement is about 10%~130%. This study provides a new idea for the selection of unconventional oil and gas well completion forms, which can provide basis and reference for the formulation of on-site production improvement plans.

Key words: well test productivity; open-hole perforation; finite element; indoor experiment; production improvement effect
收稿日期: 2023-04-28 ????
PACS: ? ?
基金資助:國家科技重大專項渤海油田高效開發(fā)示范工程(2016ZX05058) 資助
通訊作者: ,[email protected]
引用本文: ??
Characteristics of a steep slope source-to-sink system and a fan-braid transition mechanism in the Xijiang30 sub-sag, Huizhou sag, Pearl River Mouth Basin
鏈接本文: ?
版權所有 2016 《石油科學通報》雜志社