精品素人自拍偷拍|91精品国产av国产|杨思敏伦理片|91制片厂杨柳信息|亚洲激情综合|蜜桃影像传媒ios下载|亚洲精品视频在线看|打屁股色网站|爱豆文化传媒影片|国产欧美精品一区二区色,明星换脸 av,国产日韩成人av,亚洲成a人影院

 
 
 
文章檢索
首頁(yè)» 過(guò)刊瀏覽» 2016» Vol. 1» Issue (3) 384-389???? DOI : 10.3969/j.issn.2096-1693.2016.03.033
最新目錄| | 過(guò)刊瀏覽| 高級(jí)檢索
LNG液化廠防爆電氣設(shè)備全生命周期風(fēng)險(xiǎn)管理研究
吳曉寧
中海油安全技術(shù)服務(wù)有限公司, 天津300452
Research into full life-cycle risk management of explosion-proof electrical equipment in LNG liquefaction plants
WU Xiaoning
CNOOC Safety Technology Service Co., Ltd, Tianjin 300452, China

全文: ? HTML (1 KB)?
文章導(dǎo)讀??
摘要? 隨著我國(guó)LNG液化廠在沿海發(fā)達(dá)地區(qū)迅速擴(kuò)張,防爆電氣設(shè)備的安全管理成為了新能源企業(yè)安全發(fā)展的重要環(huán)節(jié)。由于現(xiàn)場(chǎng)對(duì)防爆電氣設(shè)備的管理還沒(méi)有系統(tǒng)的指導(dǎo)意見(jiàn),對(duì)防爆電氣設(shè)備的風(fēng)險(xiǎn)管理還存在很多問(wèn)題。因此,本文以氣電集團(tuán)新能源公司下屬的LNG液化廠現(xiàn)場(chǎng)檢查的問(wèn)題為依據(jù),采用問(wèn)題統(tǒng)計(jì)與定性分析相結(jié)合的方法,通過(guò)不同角度對(duì)問(wèn)題進(jìn)行系統(tǒng)的分析。同時(shí)對(duì)問(wèn)題所處的不同階段進(jìn)行分析,真實(shí)反映現(xiàn)場(chǎng)防爆電氣設(shè)備的現(xiàn)狀與發(fā)展動(dòng)態(tài),為防爆電氣設(shè)備進(jìn)行全方位全生命周期風(fēng)險(xiǎn)管理提供了科學(xué)的依據(jù)和指導(dǎo)。
服務(wù)
把本文推薦給朋友
加入我的書(shū)架
加入引用管理器
關(guān)鍵詞 : 防爆電氣設(shè)備; 定性分析; 風(fēng)險(xiǎn)管理; 全生命周期; 風(fēng)險(xiǎn)分析
Abstract

  With the rapid expansion of LNG liquefaction plants in developed coastal areas, safety management of explosion-proof electrical equipment is a key to secure development of such new energy enterprises. Due to the lack of systematic guidance on the on-site management of explosion-proof electrical equipment, there are a lot of problems in the risk management of explosion-proof electrical equipment. Based on the on-site inspection results of a new energy company's LNG liquefaction plants of the CNOOC Gas & Power Group, we carried out systematic analysis of different aspects of these results by applying both problem statistics and qualitative methods. In order to reflect the present situation and the ongoing development of explosion-proof electrical equipment, problems are analyzed by dividing equipment full life-cycles into several different stages. This study can be referenced in the full life-cycle risk management of explosion-proof electrical equipment.

Key words: explosion-proof electrical equipment ; qualitative analysis ; risk management ; full life-cycle ; risk analysis
收稿日期: 2016-11-15 ????
PACS: ? ?
基金資助:
通訊作者: [email protected]
引用本文: ??
吳曉寧. LNG液化廠防爆電氣設(shè)備全生命周期風(fēng)險(xiǎn)管理研究[J]. 石油科學(xué)通報(bào), 2016, 1(3): 384-389. WU Xiaoning . Research into full life-cycle risk management of explosion-proof electrical equipment in LNG liquefaction plants. 石油科學(xué)通報(bào), 2016, 1(3): 384-389.
鏈接本文: ?
版權(quán)所有 2016 《石油科學(xué)通報(bào)》雜志社